The firm has been involved in dam projects since 1970. The first major dam project undertaken by Enplan Group is the Kiri Dam at Numan, Gongola State for the Savannah sugar Company. The firm had been responsible for major schemes and a vast number of projects involving all kinds of dams.

 

Typical of the firm's experience is the feasibility studies, detailed design, contract documentation and construction supervision for 38 small earth dams within Katsina State in Nigeria.
Enplan Group was involved in the redesign of the 3.68 km dam at Jibiya under Jibiya Irrigation cum Water Supply Project for the Federal Government of Nigeria. The dam which was the first of its kind in Africa was redesigned incorporating a geo-dam (which comprises geo-membrane composites) on the upstream slope and geo-textiles material on the downstream to provide protection to the aeolic sand embankment.
Other feature of the redesign include: the realignment of the dam axis, carrying out detailed geotechnical investigations, design of a 2m high embankment of aeolic sand fill, a vertical filter, horizontal and toe drain, an upstream diaphragm cut off wall spanning the whole length of the crest to a depth depending on the geological profile of the sound rock underlying the dam axis.

Furthermore, the upstream geo-dam is overlain with 8cm thick concrete slabs whilst the down stream geo-textiles are over lain with rip rap. In other parts of Nigeria the firm had been involved in the feasibility studies and detailed designs of the Ibu River Project which involves the design of a dam across Ibu river for the Anambra-Imo River Basin Development Authority, the Tsiga, Dabai, Kafur, Sabke and Mangwal Dams, for the Katsina State Ministry of Agriculture and remedial works for the Turo Dam at Malumfashi for the Katsina State Water Board.

Enplan Group has experience in the investigation, surveys, designs, preparation of contract documents, supervision of construction, and instrumentation of dam weirs, small, medium and large dams all over the country.

 Enplan Group's Experience in Dam Projects include:

Design of Dam Projects

  • Jare Dam
  • Sabke Dam
  • Jada Dam
  • 38 Small Earth Dams in Katsina State
  • Kiri Dam (with Gibbs and Partners)
  • Balanga Dam
  • Ibu River Dam (with Mott Macdonald)
  • Tsiga Dam
  • Ogboro Dam
  • Okuku Dam
  • Design of Gidan Waya Dam
  • Design Review of Jibiya Dam
  • Design Review of Hadejia Barrage

Design of Weirs

  • Kpada weir
  • Oramirukwa Weir
  • Anti Salinity Weir for LSWC (with Haskoning)

Dam Safety Assessment and Rehabilitation

  • Assessment of 20 major dams for irrigation development under the FAO Review of Public Irrigation Sector in Nigeria;
  • Obudu Dam safety appraisal;
  • Investigation and design of the expansion of the Doma Dam for increasing reservoir capacity;
  • Seepage of the Zobe Dam;
  • Rehabilitation of the Alau Dam Auxiliary Spillway;
  • Engineering design of remedial works to Turo Dam;
  • Seepage of the Tiga Dam Gallery;
  • Seepage of the Kiri Dam Gallery;
  • Appraisal of failure and design of rehabilitation works for the Mangwal Dam (Katsina State);
  • Rehab. of 4 Small Earth Dams in Katsina;
  • Deidei Dam Rehabilitation;
  • Redesign of the Mangwal Dam;
  • Rehabilitation works for the Ruwan Kanya Dam
 
 
 